Propulsion apparatus for ship

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10696366
APP PUB NO 20180178890A1
SERIAL NO

15874879

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a ship propelling apparatus including a rotation shaft on which a rear propeller is fixed; a front propeller rotatably supported on the rotation shaft in front of the rear propeller; and a counter-rotating device through which the rotation shaft passes, which includes a gear box including therein a plurality of gears configured to reverse rotation of the rotation shaft and transfer the reversed rotation to the front propeller, and which is installed in an installation space formed at the rear of a ship. The rotation shaft includes a measurement hole formed to pass through a center of the rotation shaft for centering of the counter-rotating device installed in the installation space; and an individual lubricant path separated from the measurement hole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG HEAVY IND CO LTDSEOUL 06620

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Dong-Hyun Daejeon, KR 163 2415
Lee, Tae-Goo Daejeon, KR 4 9
Lee, Tae-Sik Gyeongsangnam-do, KR 4 14
Oh, Se-Myun Seoul, KR 4 11
Park, Hyun-Sang Gyeongsangnam-do, KR 50 342

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00