Method for generating synthesis gas in conjunction with a smelting works

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10697032
APP PUB NO 20160348196A1
SERIAL NO

15103143

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for producing syngas in combined operation with a metallurgical plant which comprises at least one blast furnace for producing crude iron, a converter steel mill and a coke-oven plant. Part of the blast-furnace top gas that is produced in the production of crude iron and/or part of the converter gas that occurs in the converter steel mill and/or part of the coke-oven gas that is produced in the coke-oven plant are mixed. By choosing the gas streams that are brought together to form a mixed gas and/or by changing the mixing ratios of the gas streams that are brought together, at least two streams of useful gas are produced, differing with regard to their composition and respectively prepared to form streams of syngas.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THYSSENKRUPP AGTHYSSENKRUPP ALLEE 1 ESSEN 45143

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Achatz, Reinhold Essen, DE 7 9
Büker, Karsten Dortmund, DE 7 17
Kleinschmidt, Ralph Mülheim a.d.Ruhr, DE 7 25
Krotov, Denis Dortmund, DE 6 6
Oles, Markus Hattingen, DE 48 1125
Schmöle, Peter Dortmund, DE 6 9
von, Morstein Olaf Essen, DE 14 66
Wagner, Jens Frankfurt a.M., DE 48 197

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 30, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 30, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00