Control circuit for controlling the pressure of a tire wheel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10710417
APP PUB NO 20180326799A1
SERIAL NO

15776007

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A control circuit for controlling the pressure of a wheel enclosing a first volume and a second volume includes a controlled pressure line, a first line, connectable to the controlled pressure line and connected to the first volume for introducing air inside the first volume, and a second line, connectable to the controlled pressure line and connected to the second volume for introducing air inside the second volume. The control circuit further includes a first spool valve, which is a three way-two positions valve, having a first position in which the controlled pressure line is connected to the first line, and a second position, in which the controlled pressure line is connected to the second line. The first spool valve switches from the first position to the second position if the pressure in the first volume exceeds a predetermined pressure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BLUE LEAF I P INC1100 N MARKET STREET 4TH FLOOR SUITE 4010 WILMINGTON DE 19890

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Benevelli, Alessandro Albinea, IT 42 61
Morselli, Riccardo San Vito di Spilamberto, IT 54 1046

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 14, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 14, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00