Movable tunnel braking system and passenger boarding bridge

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10724586
SERIAL NO

16330915

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A passenger boarding bridge having a movable tunnel and braking system includes a brake plate, a brake pin and a triggering device. The brake plate is fixedly disposed at a first tunnel of the plurality of tunnels, and the brake plate is provided with a plurality of brake slots. The brake pin is movably disposed at a second tunnel of the plurality of tunnels, which is sleeve-connected with the first tunnel and can be combined with the brake slot. The triggering device includes a mechanical blocking portion, a linkage mechanism and a tensile spring. The mechanical blocking portion is fixedly disposed at the second tunnel. When the tensile wire rope or the retracting wire rope is broken, the linkage mechanism is driven to move and drives the brake pin to combine with the brake slot, to brake the first tunnel and the second tunnel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHENZHEN CIMC-TIANDA AIRPORT SUPPORT LTDSHENZHEN GUANGDONG 518103

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Shaomin Guangdong, CN 3 10
Liang, Lexian Guangdong, CN 3 0
Shi, Lei Guangdong, CN 557 2723
Yao, Yunjian Guangdong, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 28, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 28, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00