Solid fuel burner

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10731850
APP PUB NO 20180195716A1
SERIAL NO

15740482

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solid fuel burner is provided with a nozzle that is provided around the central axis of the burner, that includes a straight tube section having an opening opposed to a furnace, and a curved tube section continuous with the straight tube section, and that sprays out, from the opening to the furnace, a fluid mixture which is of a solid fuel and carrier gas of the solid fuel and which is flowing in the curved tube section; a first swirler that gives the fluid mixture a swirl at the burner central axis side of the straight tube section; and a second swirler that gives, at the burner central axis side downstream of the first swirler, the fluid mixture a swirl opposite to that given by the first swirler.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI POWER LTD3-1 MINATOMIRAI 3-CHOME NISHI-KU YOKOHAMA 220-8401

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Baba, Akira Yokohama, JP 77 911
Ishii, Shota Yokohama, JP 11 103
Kuramashi, Koji Yokohama, JP 45 122
Taniguchi, Masayuki Yokohama, JP 85 864

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 4, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 4, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00