Electrode assembly, electrolysers and processes for electrolysis

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10738386
APP PUB NO 20180105942A1
SERIAL NO

15567694

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to an electrode assembly and an electrolyser using said assemblies/structures, wherein the electrode assembly comprises an anode structure and a cathode structure, each of said anode structure and cathode structure comprising an outlet header for evolved gas and spent liquid, wherein each of said anode structure and cathode structure comprising an outlet header for evolved gas and spent liquid, wherein the outlet header on the anode structure has a total internal volume of VA cm3 and the outlet header on the cathode structure has a total volume of VC cm3 wherein VA is less than VC, and/or i) the outlet header on the anode structure has an internal volume, VA cm3, an internal cross sectional area at the exit end of the header of AA cm2 and an internal length LA cm, and ii) the outlet header on the cathode structure has an internal volume, VC cm3, an internal cross sectional area at the exit end of the header of AC cm2 and an internal length LC cm, and one or both of the ratios VA/(AA×LA) and VC/(AC×LC) are less than 1.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INEOS TECHNOLOGIES LIMITEDOGIER HOUSE THE ESPLANADE ST HELIER JERSEY JE4 9WG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Revill, Brian Kenneth Sarzeau, FR 2 3
Shannon, Gary Martin Macclesfield, GB 7 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 11, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 11, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00