Systems and methods for monitoring extraction height and volume of material extracted for a mining machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10738611
APP PUB NO 20190136691A1
SERIAL NO

16234781

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for monitoring extraction height and volume of material extracted for a mining machine. The method includes operating the machine using a shearing motion at a plurality of cut locations. The method includes receiving boom height data and power consumption data. The method includes determining a cut start time. The method includes determining whether a relocation has occurred. The method includes, when the relocation has occurred: determining a cut end time. The method includes storing, in a memory, the cut start and end time, and the boom height and power consumption data. The method includes adjusting the operation of the mining machine based on the cut start and end time, and the boom height and power consumption data for at least one of the cut locations.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • JOY GLOBAL UNDERGROUND MINING LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brotherton, Joshua V Marion, US 2 1
Doerner, Justin S Mt. Vernon, US 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 11, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 11, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00