Electrode embedded member

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10750611
APP PUB NO 20190132945A1
SERIAL NO

16172967

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electrode embedded member includes a plate-shaped substrate having a front surface and a back surface and that is made of a ceramic, an inner electrode extending parallel to the front surface of the substrate and that is embedded in the substrate, a connection member extending parallel to the front surface of the substrate and that is disposed so as to overlap the inner electrode, and a terminal connected to the connection member. The electrode embedded member has a predetermined structure including at least one of the following: a first predetermined structure in which a thickness of at least a part of the connection member in a direction perpendicular to the front surface of the substrate is 0.2 mm or smaller; a second predetermined structure in which the connection member includes a cutout portion; and a third predetermined structure in which the connection member is composed of a mesh structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NITERRA CO LTDNAGOYA-SHI AICHI 461-0005

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tsuchida, Atsushi Sendai, JP 19 703

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 18, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 18, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00