Resid upgrading with reduced coke formation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10752846
APP PUB NO 20180291288A1
SERIAL NO

15933422

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods are provided for improving the processing of heavy or challenged feeds in a refinery based on integrated use of deasphalting, coking, and hydroprocessing. An optional fluid catalytic cracking unit can be included in the integrated system to allow for further improvements. The improved processing can be facilitated based on a process configuration where the vacuum resid fractions and/or other difficult fractions are deasphalted to generate a deasphalted oil and a deasphalter residue or rock fraction. The deasphalted oil can be passed into a hydroprocessing unit for further processing. The rock fraction can be used as the feed to a coking unit. Although deasphalter residue or rock is typically a feed with a high content of micro carbon residue, a high lift deasphalting process can allow a portion of the micro carbon residue in the initial feed to remain with the deasphalted oil. The portion of micro carbon residue that remains in the deasphalted oil can then be upgraded during hydroprocessing and/or during subsequent processing of the feed. By reducing the amount of micro carbon residue passed into a coker for a given initial feed source, the overall capacity for a reaction system to handle heavy feeds can be increased relative to the rate of coke production from the reaction system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EXXONMOBIL RESEARCH AND ENGINEERING COMPANY1545 ROUTE 22 EAST P O BOX 900 ANNANDALE NJ 08801-0900

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brown, Stephen H Lebanon, US 125 2145
Cunningham, Brian A Tokyo, JP 22 204
Ilias, Samia Bridgewater, US 22 122
Le, Tien V Houston, US 5 24
Raich, Brenda A Annandale, US 31 112
Smiley, Randolph J Hellertown, US 38 259

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 25, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00