Pavement systems with geocell and geogrid

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10753049
SERIAL NO

16561322

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Certain pavement systems and methods for paving are suitable for locations containing a generally weak subgrade with a California Bearing Ratio of four (4) or lower. The pavement system includes a first geogrid layer placed directly on the subgrade; a first granular layer upon the first geogrid layer, the first granular layer having a thickness of from 0.5 times to 20 times the aperture distance of the geogrid layer; a first geocell layer upon the first granular layer comprising a geocell and an infill material; and a capping layer over the geocell layer. A second geocell/geogrid layer can be placed beneath the capping layer, if desired. An optional surface layer may be applied upon the capping layer if desired. The resulting pavement system provides long-term support for pavements applied over the pavement system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GEOTECH TECHNOLOGIES LTD8213502 TEL AVIV

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Erez, Oded Tel Aviv, IL 27 222
Halahmi, Izhar Hod-hasharon, IL 56 622
Kief, Offer Avraham Zvi Haifa, IL 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 25, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00