Automated control of circumferential variability of blast furnace

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10755200
APP PUB NO 20190095812A1
SERIAL NO

15712255

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Controlling circumferential variability in a blast furnace may include generating a predictive model that sets up a relationship between a standard deviation of a selected state variable, state variables and one or more control variables in blast furnace operation for predicting the standard deviation. A number of circumferential sections of the blast furnace is defined, and the predictive model associated with the selected state variable for each of the circumferential sections is trained based on process data of the blast furnace. A plurality trained predictive models is generated associated with different circumferential sections and different selected state variables. One or more future control variable set points that minimize a sum of the plurality of predictive models, is determined. One or more future control variable set points is transmitted to a control system to control the blast furnace operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERNATIONAL BUSINESS MACHINES CORPORATIONNEW ORCHARD ROAD ARMONK NY 10504

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Young Min Old Westbury, US 162 1551
Yeo, Kyong Min Scarsdale, US 18 115

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 25, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00