Pneumatic valve arrangement

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10767665
APP PUB NO 20180283409A1
SERIAL NO

15941518

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pneumatic valve arrangement for a pneumatically operated field device, such as a control device, of a processing plant, such as a chemical plant, a foodstuff processing plant, a power plant or the like is disclosed. The valve arrangement may include an air supply conduit for receiving pressurized air from a source of pressurized air, a control air conduit for aerating and venting a pneumatic actor of the field device, and a venting conduit for discharging pressurized air to a pressure sink, such as the atmosphere; a venting valve for opening and/or closing the venting conduit and an aerating valve for opening and/or closing the air supply conduit; and a pivotable carrier lever for common actuation of the aerating valve and of the venting valve, wherein the carrier lever holds the venting valve in its closed position while it opens the aerating valve from its closed position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSON AKTIENGESELLSCHAFT60314 FRANKFURT AM MAIN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kolbenschlag, Stefan Darmstadt, DE 24 82

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 8, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 8, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00