Fiberglass material manufacture method comprising steps of sizing and desizing, and facility suitable for implementing said method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10781137
APP PUB NO 20180230047A1
SERIAL NO

15749295

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a fiberglass material manufacture method and facility, were in molten glass is converted into fiberglass material via the steps of spinning, drawing, sizing, and collecting, followed by a step of producing a resulting fiberglass material that is then subjected to thermal desizing. The fumes from the melting furnace are used to preheat a combustion reagent from the melting furnace in two steps: a first step in which air is heated via heat exchange with the fumes, and a second step in which the combustion reagent is preheated via heat exchange with the hot air, the air then being used in the step of desizing the fiberglass material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
L'AIR LIQUIDE SOCIETE ANONYME POUR L'ETUDE ET L'EXPLOITATION DES PROCEDES GEORGES CLAUDE75007 PARIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Beasse, Gregoire Paris, FR 6 8
Jarry, Luc Beaufai, FR 22 41
Joumani, Youssef Crespieres, FR 13 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 22, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00