Combined system for producing steel and method for operating the combined system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10781498
APP PUB NO 20160319383A1
SERIAL NO

15102485

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a plant complex for steel production comprising a blast furnace for producing pig iron, a converter steel mill for producing crude steel and a gas-conducting system for gases that occur when producing the pig iron and/or producing the crude steel. According to the invention, the plant complex additionally has a chemical plant or biotechnological plant, connected to the gas-conducting system, and also energy storage for covering at least part of the electricity demand of the plant complex. Also the subject of the invention is a method for operating the plant complex.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THYSSENKRUPP AGTHYSSENKRUPP ALLEE 1 ESSEN 45143

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Achatz, Reinhold Essen, DE 7 9
Bredemeyer, Niels Waltrop, DE 5 19
Kleinschmidt, Ralph Mülheim a.d.Ruhr, DE 7 25
Meißner, Christoph Dortmund, DE 5 6
Oles, Markus Hattingen, DE 48 1125
Schmöle, Peter Dortmund, DE 6 9
Völkl, Johannes Kelkheim, DE 3 7
Wagner, Jens Frankfurt a.M., DE 48 197

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 22, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00