Ash sintering gasifier

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10782021
APP PUB NO 20180051877A1
SERIAL NO

15586722

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is provided for thermally converting non-radioactive combustible wastes to a substantially non-hazardous, non-leachable, sintered particulate carbon-less ash by-product in a kiln having a plurality of reaction zones. The kiln including first and second ends and a body provided between the first and second ends that defines a cavity having a refractory lining that provides resistance to heat conduction. A processor and flow rate controllers are provided that control a flow rate through the body of waste that enters at the first end of the kiln and the flow rate of oxidant gas that enters at the second end of the kiln, the second end being opposite to the first end. The body may be positioned substantially horizontal and may include a length-to-diameter ratio and a resistance to heat conduction that provides a temperature gradient within the cavity to forms separate reaction zones during operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MOBIL TENSOR HOLDINGS LLC2480 NE 22ND COURT SUITE 1 POMPANO BEACH FL 33062

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liss, Barry Pompano Beach, US 9 36
Wilson, Brandon Ruf Bothell, US 6 34

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 22, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00