oxy-combustion power generation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10787963
APP PUB NO 20180094580A1
SERIAL NO

15104940

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power generation system burns a fuel in a gas in a combustion chamber, producing one or more combustion products and heating a working fluid, preferably supercritical CO2, that is chemically the same as a combustion product. The working fluid is mixed with the combustion products to form a combustion output mixture which is used in a turbine to drive a shaft of the turbine connected with a generator, producing electricity. The turbine outputs an exhaust that goes to a working fluid recycling system that connects the turbine outlet with the combustion chamber. The fluid recycling system has a radial compressor that receives and pressurizes the exhaust mixture and sends it to a chamber that has a bleed outlet and a recycling outlet. The recycling outlet transmits a recycled portion of the exhaust mixture to the combustion chamber, and the bleed outlet carries an excess portion of the exhaust mixture that is not to be recycled to an extraction system that removes it from the power generation system for use in other applications.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNIVERSITY OF CENTRAL FLORIDA RESEARCH FOUNDATION INC12201 RESEARCH PARKWAY SUITE 501 ORLANDO FL 32826

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amos, David Orlando, US 25 155
Kapat, Jayanta Oviedo, US 4 20
Khadse, Akshay Orlando, US 1 3
Nagaiah, Narasimha Orlando, US 2 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 29, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 29, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00