Heating and cooling system for a vehicle including a thermophysical battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10792972
APP PUB NO 20190100075A1
SERIAL NO

16149783

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A heating and cooling system for a vehicle included within a radiator module having a plurality of fins. At least two thermophysical batteries are provided, each including an adsorption bed unit and an evaporator condenser unit. At least one upper coolant line extends along the adsorption bed unit of each of the thermophysical batteries and is configured to be connected to a source of waste heat of the vehicle for transferring heat from the source of waste heat to a coolant contained in the coolant line and to the adsorption bed units to recharge the adsorption bed unit. At least one distribution element configured in discharge mode to convey heated fluids from adjacent the adsorption bed units or cooled fluids from adjacent to the evaporator condenser units to another region of the vehicle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAGNA INTERNATIONAL INCAURORA ON L4G 7K1

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dourra, Hussein Bloomfield, US 14 91
Horton, Frank Rochester Hills, US 2 5
Sinkular, Jasmin Jijina Bloomfield Hills, US 6 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 6, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 6, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00