Multi-piston bladeless wind turbine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10815965
APP PUB NO 20200263659A1
SERIAL NO

16776489

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The multi-piston bladeless wind turbine creates electrical energy using hydraulically connected pistons. The system may include a disk, a small piston in fluid communication with a large piston, and a crankshaft attached to the large piston. The disk transfers forces from the wind to the small piston. Hydraulic fluid then transfers the forces to the larger piston. When the disk and associated small piston have been forced to the end of their stroke by the wind, a gate in the disk is opened to reduce wind force on the disk by allowing air to travel through the disk. Subsequently, the disk and associated small piston are pushed back to the beginning of the stroke by the pressure created by the large piston's weight. This process is repeated by closing the gate in the disk. A crankshaft powering an electric generator is turned by the movement of the large piston.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KING SAUD UNIVERSITYP O BOX 800 RIYADH 11421

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Haidar, Zeyad Abdulwahid Ghaleb Riyadh, SA 5 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 27, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 27, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00