Aircraft and methods of performing tethered and untethered flights using aircraft

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10822080
SERIAL NO

16022537

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed are aircraft configured to perform tethered and untethered flights as well as methods of operating such aircraft. During a tethered flight, the aircraft is connected to a power line using its connecting module. While tethered, the aircraft can receive electrical energy from the power line and use this energy for propulsion and/or storage. The aircraft comprises a propulsion module for providing vertical and horizontal thrusts. In some examples, the aircraft comprises a transport module. The transport module may be removably attached to the propulsion module and be replaceable with another transportation module. During an untethered flight, the electrical energy is supplied to the propulsion module from a battery and/or a generator on board of the aircraft. The untethered flight capability can be used for landing and takeoff, flying away from power lines or when the power line is not operational, and other like examples.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOEING COMPANY929 LONG BRIDGE DRIVE ARLINGTON VA 22202

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kirkbride, David W Allyn, US 16 79

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 3, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 3, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00