Method for manufacturing high strength galvanized steel sheet and high strength galvanized steel sheet

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10837074
APP PUB NO 20150044503A1
SERIAL NO

14384298

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a high strength galvanized steel sheet and a high strength galvanized steel sheet are provided. A base steel sheet having a chemical composition comprising C: 0.03% to 0.35%, Si: 0.01% to 0.50%, Mn: 3.6% to 8.0%, Al: 0.001% to 1.000%, P≤0.10%, S≤0.010%, and the balance comprising Fe and incidental impurities, on a percent by mass basis, is subjected to annealing and galvanization treatment, wherein the maximum steel sheet temperature in an annealing furnace is 600° C. or higher and 700° C. or lower, the steel sheet transit time in a temperature region of the maximum steel sheet temperature of 600° C. or higher and 700° C. or lower is specified to be 30 seconds or more and 10 minutes or less, and the dew point in an atmosphere is specified to be −45° C. or lower.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JFE STEEL CORPORATIONTOKYO 100-0011

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fushiwaki, Yusuke Manchester, GB 35 143
Kawasaki, Yoshiyasu Chiba, JP 77 447
Nagataki, Yasunobu Tokyo, JP 59 410

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 17, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 17, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00