Process for the production of thermoplastic moulding compounds

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10843384
APP PUB NO 20180178411A1
SERIAL NO

15735286

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a process for the production of thermoplastic moulding compounds, in particular for the production of acrylonitrile-butadiene-styrene (ABS), wherein at least a first reagent (11) and a second reagent (12) of the thermoplastic moulding compounds are fed to a loop conduit (29) which comprises a static mixer (36), wherein the reagents (11, 12) are pressed in loops through the loop conduit (29) and passing the static mixer (36), whereby the reagents (11, 12) are dispersed to form a dispersion (15) in the static mixer (36). The invention also relates to a thermoplastic moulding compound that is produced by the inventive process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INEOS STYROLUTION GROUP GMBH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahn, SangJun Seoul, KR 16 28
Banaszak, Brian J Mannheim, DE 11 31
El-Jaby, Ula Ludwigshafen, DE 2 2
Fischer, Wolfgang Walldorf, DE 326 3274
Hisgen, Bernd Neuhofen, DE 25 236
Hungenberg, Klaus-Dieter Birkenau, DE 19 129
Niessner, Norbert Friedelsheim, DE 156 700
Stammer, Achim Freinsheim, DE 62 411
Walker, Roland Osnabrueck, DE 18 69

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 24, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 24, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00