Multi-layer body and method for the production thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10850551
APP PUB NO 20180290480A1
SERIAL NO

15944262

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a multi-layer body, in particular a security element, in which a partial first layer or partial first layer system is produced on a substrate, wherein the partial first layer or partial first layer system is present in a first partial area and not in a second partial area. Subsequently, a partial second layer or partial second layer system is produced, wherein the partial second layer or partial second layer system is present in a third partial area and not in a fourth partial area, and wherein the third partial area overlaps with the first and second partial areas. Finally, the partial first layer or partial first layer system is structured as a mask using the partial second layer or partial second layer system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LEONHARD KURZ STIFTUNG & CO KG90763 FÜRTH
OVD KINEGRAM AG6300 ZUG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brehm, Ludwig Adelsdorf, DE 41 468
Forster, Karin Oberasbach, DE 6 17
Kramer, Patrick Lauf, DE 5 6
Spiess, Rouven Unterageri, CH 3 10
Staub, Rene Hagendorn, CH 62 1344

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00