Polysaccharide derivatives and cross-metathesis processes for preparing them

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10851179
APP PUB NO 20160376379A1
SERIAL NO

15125787

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods for the cross-metathesis of polysaccharides with one or more olefin-terminated side chains and cross-metathesized products are described. In an exemplary embodiment, a method for the synthesis of cellulose ω-carboxyesters via olefin cross-metathesis with acrylates is described. Conditions of the reactions were relatively mild and the olefin-substituted polysaccharides and the appropriate acrylate partners appear to follow Grubbs rules as summarized herein. Additionally, a method of hydrogenation of the cross-metathesized product is described. The compounds and methods may be useful for waterborne coating applications, adhesives, lubricants, or any product in need of dispersion in an aqueous media.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VIRGINIA TECH INTELLECTUAL PROPERTIES INCBLACKSBURG VA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dong, Yifan Blacksburg, US 10 0
Edgar, Kevin J Blacksburg, US 25 245
Meng, Xiangtao Blacksburg, US 11 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00