Electromagnetically actuatable inlet valve and high-pressure pump having an inlet valve

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10851750
APP PUB NO 20180355830A1
SERIAL NO

16060293

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention proposes an electromagnetically actuatable inlet valve (24) for a high-pressure pump, in particular of a fuel-injection system. The inlet valve (24) has a valve member (34) which can be moved between and open position and a closed position. An electromagnetic actuator (60) is provided, by means of which the valve member (34) can be moved, wherein the electromagnetic actuator (60) has an armature (68) which acts at least indirectly on the valve member (34), a magnet coil (64) which surrounds the armature (68), and a magnetic core (66) against which the armature (68) comes to rest at least indirectly when current is applied to the magnet coil (64), wherein the armature (68) is movably guided in a carrier element (78), and the carrier element (78) and the magnetic core (66) are interconnected. The carrier element (78) and the magnetic core (66) are interconnected by a sleeve-shaped connection element (90) which is integrally bonded in a first connection region (92) to the carrier element (78) and/or the magnetic core (66), and interlockingly engages the carrier element and/or the magnetic core in a second connection region (94) offset relative to the first connection region (92) in the direction of the longitudinal axis (91) of the connection element (90).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROBERT BOSCH GMBHPOSTFACH 30 02 20 70442 STUTTGART

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Landenberger, Tobias Schorndorf, DE 9 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 1, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 1, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00