Power control system for electric vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10857903
APP PUB NO 20180141438A1
SERIAL NO

15570500

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power control system supplies electric power to a plurality of power consumption devices which are provided to an electric vehicle. This system includes: a high voltage battery which is an electric power supply source; a plurality of device controllers which are provided to the respective power consumption devices and which control operations of the respective power consumption devices; and an overall controller which overall controls the plurality of device controllers. At least one of the device controllers performs an electric power restriction that restricts a consumed electric power in a corresponding power consumption device so as to allow the consumed electric power in the corresponding power consumption device to fall within an electric power allocated by the overall controller while simultaneously maintaining an operation of the corresponding power consumption device stably.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DENSO CORPORATION1-1 SHOWA-CHO KARIYA-SHI AICHI 448-8661

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sakai, Koji Kariya, JP 179 2144
Sumi, Tomoyuki Kariya, JP 9 97

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 8, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 8, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00