Plasma furnace

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10861613
APP PUB NO 20180261347A1
SERIAL NO

15750272

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a plasma furnace which can efficiently treat various types of waste in large amounts. The plasma furnace comprises a melting chamber 101 for accommodating a melt, an upper surface forming the upper portion of the melting chamber 101 with a horizontal upper surface 111 and an inclined upper surface 112 having a slope with respect to the horizontal upper surface 111, a melt discharge portion 130 formed through a bottom surface of the melting chamber for discharging molten material therethrough, and an input apparatus 120 having a slope for inputting waste into the melting chamber 101, and the mixed type plasma torch 191, 192 provided on the inclined upper surface 112 with a slope for generating melting heat in the melting chamber 101.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOREA HYDRO & NUCLEAR POWER CO LTD1655 BULGUK-RO MUNMUDAEWANG-MYEON GYEONGJU-SI GYEONGSANGBUK-DO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Hyun-Je Daejeon, KR 10 60
Hwang, Young-Hwan Daejeon, KR 3 0
Kim, Cheon-Woo Daejeon, KR 31 51
Kim, Young-II Daejeon, KR 15 174
Shin, Sang-Woon Chungcheongnam-do, KR 6 41

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 8, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 8, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00