Prime mover system and methods utilizing balanced flow within bi-directional power units

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10871174
APP PUB NO 20190162206A1
SERIAL NO

16198135

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems, methods and devices are described providing a selective hydraulic or electrically powered prime mover that is a bi-directional power unit system, including movement within a device used to compress and/or expand a fluid and provide fluid movement. The use of a hydraulic power unit is involved and comprises at least a pump or other fluid moving device, a first set of selective control valves delivering pressurized fluid to the device(s), and a second set of selective control valves returning unpressurized fluid from the device(s), a reservoir comprising a compensator tank, a port for operation at ambient pressure, and a pressure measuring device measuring ambient pressure allowing for unbalanced flow to and from the device as well as thermal expansion or compression. The use of a multiport and in some cases a swashplate pump that incorporates the features and functions of several valves for the system is also described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AOLSTAFFORD TX

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lerner, Daniel Maurice Missouri City, US 66 414
Orban, Andre Sugarland, US 31 177
Singh, Ranjit Houston, US 7 53

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 22, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 22, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00