Firearm training systems and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10876818
APP PUB NO 20200256642A1
SERIAL NO

16858761

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system has at least one processor, a control subsystem, and an end unit with at least one image sensor. The control subsystem switches operation of the system between first and second modes. In the first mode, an image sensor captures a visible light image of a scene, and a processor analyzes the visible light image to identify a target in the scene and extract target spatial information. In the second mode, an image sensor captures a series of IR images of the scene, and a processor analyzes the IR images to identify firearm projectile strikes on the target based on the extracted spatial information and comparisons between the IR images. In certain embodiments, the same image sensor is used for visible light and IR image, and an IR filter is selectively positioned in an optical path from the scene to the image sensor according to the mode of operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MODULAR HIGH-END LTDP O BOX 3006 HERZLIYA B HERZLIYA 4613001

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tamir, Gal Herzliya, IL 30 373

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 29, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 29, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00