Connecting element of a toy construction kit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10881976
APP PUB NO 20200346126A1
SERIAL NO

16761393

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to fastening elements of a toy construction kit and can be used for creating toy construction kit elements which are connected by means of connecting elements. A connecting element of a toy construction kit consists of two parts, a receiving part and a removable part, which, when brought together, fasten together under the effect of magnetic forces such as to be disconnectable and rotatable about the coupling point by 360°. The receiving part consists of a disc, a collar, and a neodymium magnet in the form of a truncated cone-shaped collar, which have different diameters and are fastened to one another. The removable part consists of a disc with a through opening, a collar, and a neodymium magnet, which have different diameters, and a metal rod, which are fastened to one another.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOBRIKOV ALEKSANDR BORISOVICHNORILSK

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bobrikov, Aleksandr Borisovich Norilsk, RU 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 5, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 5, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00