Hydrogen generator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10883181
APP PUB NO 20180305828A1
SERIAL NO

15765650

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a hydrogen generator which is provided with: an electrolytic cell; an anion exchange membrane which divides the electrolytic cell into a cathode chamber and an anode chamber; a cathode chamber water supply part which supplies water to the cathode chamber; an anode chamber water supply part which supplies water to the anode chamber; a cathode that is provided on the cathode chamber-side surface of the anion exchange membrane; an anode that is provided on the anode chamber-side surface of the anion exchange membrane; a cathode feeder that is arranged within the cathode chamber and feeds power to the cathode; an anode feeder that is arranged within the anode chamber and feeds power to the anode; and an active oxygen reduction material that is arranged within the anode chamber and reduces active oxygen generated within the anode chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI HEAVY INDUSTRIES ENVIRONMENTAL & CHEMICAL ENGINEERING CO LTDJAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nasu, Yusaku Tokyo, JP 2 11
Takanami, Hiroyuki Yokohama, JP 1 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 5, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 5, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00