Torsion beam manufacturing method, torsion beam manufacturing apparatus, and torsion beam

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10888916
APP PUB NO 20190091756A1
SERIAL NO

16097180

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This torsion beam manufacturing method is a method for manufacturing a torsion beam which is provided with a uniformly shaped closed cross-sectional portion in which a cross section orthogonal to a longitudinal direction is a closed cross section having a substantial V-shape or a substantial U-shape with a pair of ear portions, and a shape changing portion which leads to the uniformly shaped closed cross-sectional portion and in which a shape of the closed cross section changes progressively away from the uniformly shaped closed cross-sectional portion, the torsion beam manufacturing method comprising: thickening to form a pair of thickened portions in at least the shape changing portion by pressurizing each of the pair of ear portions from outside against swelling of the pair of ear portions in a slate where both outer surfaces of each of the pair of ear portions are supported.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATIONTOKYO 100-8071

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iguchi, Keinosuke Tokyo, JP 6 9
Mizumura, Masaaki Tokyo, JP 28 183

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 12, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 12, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00