Nuclear power plant spent fuel negative pressure unloading system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10902962
APP PUB NO 20190006054A1
SERIAL NO

16063186

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nuclear power plant spent fuel negative pressure unloading system comprises a fuel element transport pipe and a gas transport pipe. The fuel element transport pipe comprises a fuel element output pipe, a fuel element lifting pipe, and a fuel element unloading pipe connected in series. The fuel element unloading pipe is arranged obliquely downward in the direction of fuel element movement. The distal end of the fuel element unloading pipe is connected sequentially to fuel loading apparatus and a transfer apparatus. Two nozzles of the gas transport pipe are connected to set positions on the fuel element output pipe and the fuel element unloading pipe respectively. A gas driving mechanism is connected to the gas transport pipe. An inlet of the gas driving mechanism is arranged at one end in proximity to the fuel element unloading pipe.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TSINGHUA UNIVERSITYHAIDIAN DISTRICT BEIJING 100084

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Yue Beijing, CN 869 5176
Wang, Jinhua Beijing, CN 46 185
Wu, Bin Beijing, CN 269 4282
Zhang, Zuoyi Beijing, CN 18 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 26, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 26, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00