System for predicting auger failure in a tire injection filling mixing machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10906260
SERIAL NO

16990785

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of performing preventative maintenance on an auger in a tire filling mixing machine, by: (a) mixing a polyurethane isocyanate and a catalyst in a first mixer to form a virgin polyurethane; (b) grinding polyurethane core bits in a grinder, the grinder having an auger and a motor; (c) mixing the virgin polyurethane and the ground core bits in a second mixer thereby forming a mixed flatproofing material; (d) injecting the mixed flatproofing material into a tire; (e) measuring vibration of the auger; and (f) comparing the measured vibration of the auger to a predefined maximum vibration; and (g) removing the auger from the grinder if the measured vibration exceeds the pre-defined maximum vibration for a predefined period of time, or removing the auger from the grinder if the measured temperature of the auger exceeds the pre-defined maximum temperature for a predefined period of time.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CARLISLE CONSTRUCTION MATERIALS, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bishop, John DuBois, US 46 497
Little, Jeff Rossville, US 5 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 2, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 2, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00