Guide rail oiling tool

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10907767
APP PUB NO 20190101242A1
SERIAL NO

16053913

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A guide rail oiling tool includes: a sliding body, which is capped on a guide rail and slidable along the guide rail, and has an inner side surface facing a surface to be oiled of the guide rail, a shape of the inner side surface being matched with a shape of the surface to be oiled of the guide rail; an oil inlet disposed on the sliding body; and an oiling groove in communication with the oil inlet, disposed on the inner side surface of the sliding body and surrounding the surface to be oiled of the guide rail, so that the oiling groove applies oil to the surface to be oiled of the guide rail when the sliding body is sliding.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOE TECHNOLOGY GROUP CO LTDBEIJING 100015
HEFEI BOE OPTOELECTRONICS TECHNOLOGY CO LTDNO 2177 TONGLINGBEI ROAD HEFEI ANHUI 230012

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ding, Dong Beijing, CN 45 53
Dong, Wei Beijing, CN 102 562
Huang, Jinwei Beijing, CN 2 0
Liu, Huan Beijing, CN 181 1449
Song, Gan Beijing, CN 7 4
Wang, Hu Beijing, CN 70 222
Wang, Hualu Beijing, CN 2 2
Wang, Jian Beijing, CN 1906 17240
Wang, Xiaokun Beijing, CN 15 22
Wen, Qingliang Beijing, CN 2 2
Xuan, Zengzhi Beijing, CN 1 0
Zhang, Wenjun Beijing, CN 111 675
Zhang, Xunze Beijing, CN 5 6
Zhu, Hao Beijing, CN 223 1433

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 2, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 2, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00