Optical modulator using phase change material and device including the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10908437
APP PUB NO 20180046056A1
SERIAL NO

15674103

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are optical modulators and devices including the optical modulators. The optical modulator may include an optical modulation layer that includes a phase change material. A first electrode may be provided on a first surface of the optical modulation layer. A second electrode may be provided on a second surface of the optical modulation layer. A first phase controlling layer may be provided, the first electrode being disposed between the first phase controlling layer and the optical modulation layer. A second phase controlling layer may be provided, the second electrode being disposed between the second phase controlling layer and the optical modulation layer. Each of the first and the second phase controlling layers may have an optical thickness corresponding to an odd multiple of λ/4, where λ is a wavelength of incident light to be modulated by the optical modulator. The optical modulator may further include at least one reflective layer. The optical modulation layer may have a thickness of about 10 nm or less. An operating voltage of the optical modulator may be about 10 V or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTDSUWON-SI 16677

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Na, Byunghoon Suwon-si, KR 60 312
Park, Yonghwa Yongin-si, KR 43 285

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 2, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 2, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00