Method and former for necking and thickening tube end

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10913096
APP PUB NO 20190143386A1
SERIAL NO

16186492

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and a former for necking and thickening a tube end. The former includes a hydraulic cylinder, a pusher, a concave die, a filler block, a plurality of heating rods and a heating device. The hydraulic cylinder is connected to a disc provided with a guide sleeve. The pusher is provided on the hydraulic cylinder and passes through the guide sleeve. The concave die is provided at a side of the pusher and includes a mold cavity and a plurality of heating holes. The filler block is provided in the mold cavity. The heating rods are provided in the heating holes connected to the heating device. The filler block includes a tapered portion provided at one end of the filler block and a diameter-reduced portion. The tapered portion is threadedly connected to the diameter-reduced portion. An ejector pin is provided at one end of the diameter-reduced portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NANCHANG HANGKONG UNIVERSITY (NCHU)330063 NANCHANG JIANGXI PROVINCE AND SOUTH ROAD NO 696 NANCHANG CITY JIANGXI PROVINCE 330063

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Xiao, Jie Jiangxi, CN 88 652
Xu, Xuefeng Jiangxi, CN 24 216

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 9, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 9, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00