Resistor component

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10923253
SERIAL NO

16869927

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A resistor component includes a support substrate, a resistive layer disposed on one surface of the support substrate, and a plurality of slits disposed in the resistive layer, each extending from one end or another end of the resistive layer opposing each other in a first direction, and spaced apart from each other in a second direction traversing the first direction. First and second internal electrodes are disposed on the support substrate and are respectively disposed on one end and another end of the resistive layer opposing each other in the second direction to be spaced apart from each other. A first protective layer is disposed on the resistive layer. The plurality of slits include a primary slit covered by the first protective layer, and a secondary slit extending in the first protective layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRO-MECHANICS CO LTDGYEONGGI DO KOREA SUWON SUWON GYEONGGI-DO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Ah Ra Suwon-si, KR 11 34
Park, Gwang Hyeon Suwon-si, KR 3 3
Yoon, Ji Sook Suwon-si, KR 6 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 16, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 16, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00