Composite material, method for manufacturing composite material, and method for manufacturing molded article

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10926488
APP PUB NO 20180126674A1
SERIAL NO

15563922

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a composite material capable of keeping a good appearance even after heat processed, a method for manufacturing a composite material and a method for manufacturing a molded article. The composite material of the present invention contains a commingled yarn that contains a continuous reinforcing fiber (A) and a continuous thermoplastic resin fiber (B) as fiber components thereof; and a thermoplastic resin fiber (C) that keeps the commingled yarn in place, a thermoplastic resin that composes the thermoplastic resin fiber (C) having a melting point 15° C. or more higher than the melting point of a thermoplastic resin that composes the continuous thermoplastic resin fiber (B).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI GAS CHEMICAL COMPANY INC5-2 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 1008324 ?1008324

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kaji, Masataka Ishikawa, JP 10 30
Matsumoto, Nobuhiko Kanagawa, JP 59 162
Nakai, Asami Gifu, JP 22 75
Ohtani, Akio Gifu, JP 20 141
Takagi, Mitsuro Ishikawa, JP 7 28

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 23, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 23, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00