High-strength galvanized hot-rolled steel sheet and method for manufacturing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10927441
SERIAL NO

16481646

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided are a high-strength galvanized hot-rolled steel sheet and a method for manufacturing the steel sheet. A steel sheet has a chemical composition, and a galvanized layer is disposed on the steel sheet. The chemical composition includes, in mass %, C: 0.02% or greater and 0.30% or less, Si: 0.01% or greater and 2.5% or less, Mn: 0.3% or greater and 3.0% or less, P: 0.08% or less, S: 0.02% or less, and Al: 0.001% or greater and 0.20% or less. The galvanized layer has a coating weight per side of 20 to 120 g/m2. A surface of the steel sheet has a specific surface area ratio, r, of 2.5 or less, and an amount of Si present in the galvanized layer and an amount of Mn present in the galvanized layer respectively satisfy: amount of Si×r≤0.06, and amount of Mn×r≤0.10.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JFE STEEL CORPORATIONTOKYO 100-0011

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fushiwaki, Yusuke Tokyo, JP 35 143
Koba, Masaki Tokyo, JP 17 34
Nagataki, Yasunobu Tokyo, JP 59 410

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 23, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 23, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00