Ignition plug, control system, internal combustion engine, and internal combustion engine system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10931087
APP PUB NO 20190165548A1
SERIAL NO

16321218

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An ignition plug includes a tubular insulator, a metallic shell disposed around the outer circumference of the insulator, a center electrode disposed in an axial hole of the insulator, and a ground electrode connected to the forward end of the metallic shell and facing the center electrode. The metallic shell has a threaded portion to be engaged with an internal combustion engine. The relational expression Ss/(Sa+Sb)≥2.6 is satisfied, where Ss is the surface area of an outer circumferential surface of the metallic shell extending from the rear end of the threaded portion to the forward end of the threaded portion, Sa is the surface area of that portion of the metallic shell which is to be exposed to combustion gas of the internal combustion engine, and Sb is the surface area of that portion of the insulator which is to be exposed to the combustion gas.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NITERRA CO LTD1-1-1 HIGASHISAKURA HIGASHI-KU NAGOYA-SHI AICHI 4610005

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kato, Tomoaki Nagoya, JP 123 1068

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 23, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 23, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00