Equipment for perforated pre-impregnated reinforcement materials

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10941510
APP PUB NO 20190177893A1
SERIAL NO

15836315

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus for perforating a carbon fiber substrate material comprises a support structure including a first side support and a second side support and a cylindrical anvil rotatably connected between the first side support and the second side support. The anvil is configured to move the carbon fiber substrate material in response to rotation of the anvil. The apparatus further comprises a cylindrical cutting wheel rotatably connected to the support structure between the first side support and the second side support and positioned adjacent to the anvil. The cutting wheel includes a plurality of blades projecting outward from an outer surface of the cutting wheel wherein the blades of the cutting wheel are configured to perforate the carbon fiber substrate material when the carbon fiber substrate material moves between the anvil and the cutting wheel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GM GLOBAL TECHNOLOGY OPERATIONS LLC300 RENAISSANCE CENTER MAIL CODE 482-C24-A68 P O BOX 300 DETROIT MI 48265

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kia, Hamid G Bloomfield Hills, US 111 1386
Zhao, Selina X Rochester Hills, US 18 78

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 9, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 9, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00