Modified CO2 cycle for long endurance unmanned underwater vehicles and resultant chirp acoustic capability

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10946944
APP PUB NO 20190241242A1
SERIAL NO

16384012

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A carbon dioxide cycle power generation system includes a first carbon dioxide storage configured to store a first portion of carbon dioxide and a second carbon dioxide storage configured to store a second portion of the carbon dioxide. The carbon dioxide cycle power generation system also includes a generator configured to generate electrical power based on a flow of at least part of the carbon dioxide between the first and second carbon dioxide storages. The carbon dioxide cycle power generation system is configured to cycle between different underwater depths in order to employ water pressure and/or water temperature in creating the flow of the at least part of the carbon dioxide through the generator. The second carbon dioxide storage includes an annular region surrounding a central region, where the annular region has a variable internal volume configured to receive at least part of the second portion of the carbon dioxide.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RAYTHEON COMPANY870 WINTER STREET WALTHAM MA 02451-1449

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Heinen, Gregory W Lowell, US 18 68

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 16, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 16, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00