Expandable power marine hydrokinetic turbines, pumps, compressors and transmissions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10947956
SERIAL NO

16233365

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A marine hydrokinetic electric power or wind power generator may have three modules: a harnessing module, a controlling module, and a generating module. The harnessing module may have one of a propeller and a waterwheel for receiving wind or water energy. The controlling module may have a gearbox comprising gears for matching the expected wind or water generating power to an output power, a control motor, and a three variable gear assembly. The three variables are a variable input, a constant output and a constant speed control motor input variable. The variable input is received from the harnessing module and the constant output is delivered to an electricity generator. A generating module (generator) generates output power which may be a multiple of ten times the power rating of the controlling module (the constant speed control motor).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DIFFERENTIAL DYNAMICS CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Han, Kyung Soo Timonium, US 32 238

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 16, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 16, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00