System for predicting auger failure in a tire injection filling mixing machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10953616
SERIAL NO

17132853

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of performing preventative maintenance on an auger in a tire filling mixing machine, by: (a) mixing a polyurethane isocyanate and a catalyst in a first mixer to form a virgin polyurethane; (b) grinding polyurethane core bits in a grinder, the grinder having an auger and a motor; (c) mixing the virgin polyurethane and the ground core bits in a second mixer thereby forming a mixed flatproofing material; (d) injecting the mixed flatproofing material into a tire; (e) measuring vibration of the auger; and (f) comparing the measured vibration of the auger to a predefined maximum vibration; and (g) removing the auger from the grinder if the measured vibration exceeds the pre-defined maximum vibration for a predefined period of time, or removing the auger from the grinder if the measured temperature of the auger exceeds the pre-defined maximum temperature for a predefined period of time.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CARLISLE CONSTRUCTION MATERIALS LLC1555 RITNER HIGHWAY CARLISLE PA 17013

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bishop, John DuBois, US 46 497
Little, Jeff Rossville, US 5 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 23, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 23, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00