Hydraulic derate stability control and calibration

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10954654
APP PUB NO 20190264422A1
SERIAL NO

15908561

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A work machine includes systems and methods for stability control and for calibrating the stability control. During operation the load on a work implement is detected and it is determined if the load is at or above a threshold value. A derated fluid output is determined if the load is at or above the threshold value. A control signal is output to the valve based on the derated fluid output. During calibration the pressure in a hydraulic cylinder is detected at one or more locations as a mechanical arm moves between a lower position and an upper position. One or more baseline values are established for the mechanical arm between the lower position and the upper position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DEERE & COMPANYONE JOHN DEERE PLACE MOLINE IL 61265

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kellogg, Brian K East Dubuque, US 13 25
Kenkel, Aaron R Asbury, US 32 94
Lehmann, Doug M Bellevue, US 15 50
Leinaar, Kyle E Centralia, US 4 10
Myers, David J Dubuque, US 75 7049

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 23, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 23, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00