Operation system for piston-type expander, and operation method for piston-type expander

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10975765
SERIAL NO

16971672

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An operation system for a piston-type expander includes: a first engaging member which is fixed to an output shaft of the piston-type expander, rotates together with the output shaft, and has a first slanting surface; a second engaging member which is rotatably disposed on the output shaft, and has a second slanting surface; and a drive device which, while keeping a rotation direction of the second engaging member around the output shaft fixed, moves the second engaging member in an axial direction of the output shaft to press the second slanting surface onto the first slanting surface, converts a pressing force of the second engaging member in the axial direction into a rotational torque of the first engaging member and the output shaft at a contact surface of the first and second slanting surfaces, and causes the first engaging member to rotate together with the output shaft.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ISUZU MOTORS LIMITEDTOKYO 140-8722

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abe, Makoto Fujisawa, JP 179 1636
Fukunaga, Susumu Fujisawa, JP 3 4
Kato, Kota Fujisawa, JP 31 172
Matsuuki, Tomofuyu Fujisawa, JP 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 13, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 13, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00