Semiconductor devices

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10978655
APP PUB NO 20200006269A1
SERIAL NO

16562434

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device includes a first conductive pattern at an upper portion of a first insulating interlayer on a first substrate, a first plurality of conductive nanotubes (CNTs) extending vertically, a second conductive pattern at a lower portion of a second insulating interlayer beneath a second substrate, and a second plurality of CNTs extending vertically. A lower surface of the second insulating interlayer contacts an upper surface of the first insulating interlayer. At least a portion of a sidewall of each of the first plurality of CNTs is covered by the first conductive pattern, and at least a portion of a sidewall of each of the second plurality of CNTs is covered by the second conductive pattern. The first and second conductive patterns vertically face each other, and at least one of the first plurality of CNTs and at least one of the second plurality of CNTs contact each other.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTD129 SAMSUNG-RO YEONGTONG-GU SUWON-SI GYEONGGI-DO 16677

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hong, Yi-Koan Yongin-si, KR 6 141
Lee, Ho-Jin Seoul, KR 157 1949
Lee, Nae-In Seoul, KR 107 2016
Moon, Kwang-Jin Hwaseong-si, KR 70 1005

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 13, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 13, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00