High protein organic materials as fuel and processes for making the same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10982162
APP PUB NO 20190284491A1
SERIAL NO

16345151

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process of making a fuel product from a non-combustible high protein organic material such as a biological by-product or waste material. The moisture content of the high protein organic material is mechanically reduced and dried to reduce the moisture content to less than ten percent (10%). The high protein organic material is pulverized to a particle size of less than about 2 mm. The high protein organic waste material is fed into a combustion chamber and separated during combustion such as by spraying of the high protein organic waste material within the combustion chamber. Temperature and nitrogenous hydrocarbon combustion reactions within the combustion chamber are also controlled by injection of steam within the combustion chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AKBEV GROUP LLC5429 SHAUNE DRIVE JUNEAU AK 99801

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Holmes, Curtis Juneau, US 9 11
Larson, Geoffrey L Juneau, US 6 3
Smith, Brandon Michael Chico, US 13 24
Wilson, David D Juneau, US 12 43

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 20, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 20, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00