Electrode assembly, electrode structures and electrolysers

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 10988846
APP PUB NO 20180148848A1
SERIAL NO

15567644

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to an electrode assembly, electrode structures and an electrolyser using said assemblies/structures, and in particular provides an electrode assembly comprising an anode structure and a cathode structure, each of said anode structure and cathode structure comprising i) a flange which can interact with a flange on an another electrode structure to hold a separator in between the two, ii) an electrolysis compartment which contains an electrode, and which in use contains a liquid to be electrolysed, iii) an inlet for the liquid to be electrolysed and iv) an outlet header for evolved gas and spent liquid, wherein the outlet header on one of the anode structure and the cathode structure is an external outlet header and the outlet header on the other one of the anode structure and the cathode structure is an internal outlet header, as well as to electrolysers comprising a plurality of such electrode assemblies.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INEOS TECHNOLOGIES LIMITEDOGIER HOUSE THE ESPLANADE ST HELIER JERSEY JE4 9WG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Revill, Brian Kenneth Sarzeau, FR 2 3
Shannon, Gary Martin Macclesfield, GB 7 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 27, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 27, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00