Control system for work vehicle, control method, and work vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11001993
APP PUB NO 20200291616A1
SERIAL NO

16084021

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A work vehicle control system includes an actual topography acquisition device, a storage device, a soil amount acquisition device, and a controller. The actual topography acquisition device acquires actual topography information, which indicates an actual topography of a work target. The storage device stores design topography information, which indicates a final design topography of the work target. The soil amount acquisition device generates a soil amount signal indicating a held soil amount of the work implement. The controller acquires the actual topography information from the actual topography acquisition device, the design topography information from the storage device, and the soil amount signal from the soil amount acquisition device. The controller determines an intermediate design topography positioned above the actual topography and below the final design topography in accordance with the held soil amount. The controller generates a command signal to move the work implement based on the intermediate design topography.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOMATSU LTD2-3-6 AKASAKA MINATO-KU TOKYO 1078414 JAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ishibashi, Eiji Tokyo, JP 41 464
Kirino, Kazuyuki Tokyo, JP 6 23
Kogawa, Yosuke Tokyo, JP 10 43
Nagano, Seiji Tokyo, JP 12 30
Yamamoto, Kenji Tokyo, JP 747 7580
Yonezawa, Yasuhito Tokyo, JP 13 79

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 11, 2024
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 11, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 11, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00